This year I will try to post these “PV (photovoltaic) and BESS (battery energy storage systems)” reports frequently enough to where I can get them each into a single post (in 2021 I did a total of six posts). I will also try to make the first part of each post on any technology or business development and the last part will cover major projects.
This year I will also try to use the following criteria for what constitutes a major project:
• PV-only: larger than 100 MW output
• BESS-only: larger than 100 MW output
• Combined PV and BESS – larger than 100 MW for either source
PV and BESS, Early 2022
3 replies