Welcome to the new Energy Central — same great community, now with a smoother experience. To login, use your Energy Central email and reset your password.

John Benson
John Benson
Expert Member
Top Contributor
Grid Builder

PV and BESS, Early 2022

pv_and_bess_early_2022.pdf
1.23MB

This year I will try to post these “PV (photovoltaic) and BESS (battery energy storage systems)” reports frequently enough to where I can get them each into a single post (in 2021 I did a total of six posts). I will also try to make the first part of each post on any technology or business development and the last part will cover major projects.
This year I will also try to use the following criteria for what constitutes a major project:
•    PV-only: larger than 100 MW output
•    BESS-only: larger than 100 MW output
•    Combined PV and BESS – larger than 100 MW for either source
 

3 replies