Thu, May 28

NEWS: Appalachian Power is seeking 1.1 GW of clean generation in PJM territory.

  • The utility has issued three RFPs for renewables. These call for 1.1 GW of wind, solar, and hydro capacity. Appalachian Power says these projects must live in the PJM footprint (or connect to the utility distribution system), and come online by Dec. 2029. This electron injection arrives as PJM faces a capacity shortage as early as next year.

1