John Jennings
Senior Electrical Engineering Project Manager
Personal Details
Length of service in the profession: Since 1985
Year joined Jacobs: Since 2024
Jacobs office location: Cary, NC
Summary Biography
Energetic, driven, and detail-oriented Thought Leader, Product Manager and Strategic solutions provider with outstanding project management and risk management skills. Quick, decisive, and highly strategic in identifying, evaluating, selecting, and executing the right options to drive company valuation—whether controlling costs, invigorating product development, or repositioning product in response to changing market demands. Creative and innovative resource with specialized skills in negotiations, project management, contract resolution, resource management, cost and budget management, and scope management. Proven record of leading complex multimillion-dollar projects and developing high-quality technical products that solve business problems and provide tangible results.
Key Skills and Areas of Expertise
- Renewable energy including solar and battery storage systems (BESS)
- Distributed Generation
- Smart Grid Technologies
- Nuclear Power systems and operations
- Risk Management
- Product Management
- Project Management
- Quality Assurance
- Decision Analysis and Resolution
- Product life cycle testing
- Automation Systems
- Codes and standards
Education and Qualifications
- NCSU Project Management Certificate, June 2008
- BSEET, Southern Polytechnical State University, 1991
- Nuclear Power Operations, US Navy Nuclear Power School, 1985
Registrations and Certifications
- PMI Project Management Professional, Certificate ID #536892 ; Issued July 2008; Expiration July 2027
Memberships and Affiliations
- Member, PMI, Status (Active)
- Member UL9540 BESS standards Group, Status (Active)
- Member IEEE 1547 standards group, Status (Active)
- Member IEEE 1584 standards group, Status (Inactive)
Training
- ABB/Hitachi Advanced Contract management, Sept 2020
- Duke Energy Fostering and Uniting Excellent Leaders (FUEL), June 2018
- Duke Energy Leadership, Effectiveness, Alignment, and Development (LEAD), August 2017
- Duke Energy Situational Leadership, March 2017
- INPO Front Line Leadership, Dec 2016
- ABB Global Quality Assurance NQA-1 lead auditor certification, June 2009
- ABB Global Quality Assurance Root Cause Analysis Certification, June 2009
Achievements and Awards
- Recipient of Schneider Electric Local Award Winner (PWMD)
- Recipient of Schneider Electric National Award Winner (PWMD)
- Recipient of Schneider Electric Team Award for Ethernet Technologies
- US Naval Nuclear Operations Excellence award
Languages
- English (mother tongue)
- Spanish (basic)
Employment History
- March 2024 to Present, Jacobs Limited, Project Manager
- January 2023 to March 2024, Enervenue, BESS Compliance Manager
- March 2022 to January 2023, Strata Clean Energy, Director – Electrical Engineering
- February 2019 to March 2022, ABB/Hitachi, Microgrids Project Manager
- July 2016 to February 2019, Duke Energy Harris Nuclear Plant Electrical engineering manager,
- Jan 2016 to July 2016, Bank of America, Data Center Project Manager(contract)
- Jan 2013 to Jan 2016, PCX Corporation, Director of Engineering
- Feb 2011 to Jan 2013, Power Analytics, Product Manager of Microgrids and Software Quality
- Feb 2006 to Feb 2011, ABB, Product Manager Low voltage motor control centers
- Jan 2005 to Feb 2006, Eaton, Product Manager Low voltage motor control centers
- Feb 1998 to Jan 2005, Schneider Electric, Product Manager Product Manager Low voltage motor control centers
- Jan 1995 to Feb 1998, Jacobs Engineering, Conrols System Engineer
- Jan 1992 to Jan 1995, Syncroflo, Pumping Station Engineer
- Jan, 1991 to Jan 1992, Bechtel, Nuclear control systems engineer
- Feb 1983 to Feb 1989, US Navy, Nuclear Electricians Mate
Project Experience
* Denotes project was completed while with a previous employer.
Electrical Proposal Management and Submittals, dates of involvement (2024 – present)
Client : Multiple
Role on project: Capture Manager/Proposal Manager
Responsibilities: Develop scope of work for projects and electrical engineering hours required for estimating, including utilization of pricing tool to win work
Added Value: Provided source of incoming work from multiple customers for electrical engineering group
BESS, Sanford, NC dates of involvement (2024)
Client : Origin Energy
Role on project: Project Manager and owners engineer representative
Responsibilities: Tested BESS system per UL9540A unit level and large-scale fire testing per NFPA 855
Added Value: Confirmed new BESS meets the fire testing requirements laid out in the standards and provided daily reports to owner during testing
Site Development – multiple Buildings, St. Louis, MO, dates of involvement (2024-present)
Client: Confidential
Role on project: Electrical Engineer
Responsibilities: Specification creation and review; coordinated with on-site contractors for electrical engineering support; coordinated with other engineering disciplines for construction drawings; QC drawing review checks
Scope, description, and value:
Conceived as “The Production System of the Future”, as part of classified programs for a confidential client, the Saint Louis Site Expansion project mission is to accommodate advanced assembly facilities and associated post assembly operations center for future generations of high tech aircraft. The campus expansion includes 3 primary sites a total of 166 acres, 13 Primary building facilities at a total of 2.6 million gross square feet.
The Design and construction will take place in 2 phases through 2030. The condensed project schedule is critical to the client’s success and therefore Jacobs has developed a “kit of parts” strategy to quickly adapt to potential scope, site program, or other changes due to evolving project information and constraints. Additionally, the ‘kit of parts’ strategy will allow Jacobs to design the facilities efficiently with consistent quality. The campus vision has 3 primary considerations; Function, Security/safety, and Sustainability.
Jacobs scope of design and engineering services includes Architectural, Interiors, Landscape Architecture, Civil, Structural, Mechanical, Electrical / Lighting, Plumbing, Fire Protection, Telecom, and Signage.
BESS Compliance Testing, Fremont, CA, dates of involvement (2022-2023) *
Client : Enervenue
Role on project: BESS Compliance Manger
Responsibilities: Design, Test and certify Ni-H2 battery storage systems for packaging in BESS.
Added Value: Certified systems per UL1973, UL9540, UL9540a, UL991, and UL 1998
Utility scale solar power plants, Multiple locations, dates of involvement (2022) *
Client : Strata Clean Energy
Role on project: Director Electrical Engineering
Responsibilities: Design, Develop, and Install Multiple locations for solar power plants
Added Value: Added solar power plants to the power grid.
Microgrid, Black Duck Island, Outer Banks, NC, dates of involvement (2022) *
Client : Cross Trail Outfitters (CTO)– non-profit
Role on project: Director Electrical Engineering
Responsibilities: Design, Develop, and Install solar and battery system on a remote island 20221202 Solar and Battery Energy Provide Off-Grid Power for a Non-Profit Youth Camp (franklinwh.com)
Added Value: Eliminated need for diesel generators and hauling diesel fuel to remote island.
BESS, Detroit, MI, dates of involvement (2019-2021) *
Client : Detroit Edison
Role on project: Project Manager
Responsibilities: Design, Develop, and Install 1MW BESS
Added Value: Stabilized power grid in an area of downtown Detroit.
Substation Automation, Newark, NJ, dates of involvement (2019-2022) *
Client: New Jersey Transit
Role on project: Project Manager
Responsibilities: Coordinated conversion from electro-mechanical relays to grid edge relays for 55kV transit system
Added Value: Eliminated complicated wiring to fiberoptic network protection system.
Complex Power supplies, Hanford, WA, dates of involvement (2019-2022) *
Client: DOE – Hanford Nuclear site
Role on project: Project Manager
Responsibilities: Coordinated design, construction, and commissioning of power suppliers for vitrification process to clean nuclear wastewater
Scope, description, and value: https://www.hanfordvitplant.com/
Added Value: Provided main power system to melt glass and combine with nuclear wastewater to create glass marbles for long term storage.
Substation Automation, Longview TX, dates of involvement (2019-2022) *
Client: Eastman Chemical
Role on project: Project Manager
Responsibilities: Coordinated design and implementation of grid edge substation relays on 15kv and 480V distribution platforms
Scope, description, and value: Total of 12 digital substations upgraded.
Added Value: Allowed plant operations to save money by trending electrical usage across the site.
Microgrid, Gull Bay, Canada, dates of involvement (2019-2020) *
Client: OPG - KZA
Role on project: Project Manager
Responsibilities: Coordinated design and implementation of BESS and Solar microgrid in remote Canadian community
Scope, description, and value: https://www.opg.com/releases/community-micro-grid-project-now-online/
Added Value: Reduced dependency on diesel generators for electricity.
Microgrid, Cordova, AK, dates of involvement (2019-2020) *
Client: Cordova Electric cooperative
Role on project: Project Manager
Responsibilities: Coordinated design and implementation of 1MW BESS system in AK
Scope, description, and value: https://new.abb.com/news/detail/62476/battery-power-moves-a-remote-and-resilient-alaska-fishing-town-closer-to-energy-independence
Added Value: Reduced dependency on diesel generators for electricity.
Microgrid, Bermuda, dates of involvement (2019-2020) *
Client: Bermuda Electric Light Company (BELCO)
Role on project: Project Manager
Responsibilities: Coordinated design and implementation of 10MW BESS system in Bermuda
Scope, description, and value: https://www.energy-storage.news/no-brainer-bermudas-10mw-ess-helps-reliability-lowers-costs/
Added Value: Stabilized grid at end of the island – especially during storm outages.
Nuclear Power Plant, New Hill, NC, dates of involvement (2016-2019) *
Client: Duke Energy
Role on project: Manager electrical systems
Responsibilities: Coordinated outage work and was night shift engineering manager for single unit 1000 MW nuclear station
Scope, description, and value: https://en.wikipedia.org/wiki/Shearon_Harris_Nuclear_Power_Plant
Added Value: Maintained outage schedule and tasks for all electrical systems. Safety champion for teams on shift work
LV Motor Control centers arc-flash product development, Raleigh, NC, dates of involvement (2006-2009) *
Client: ABB
Role on project: New Product Development
Responsibilities: Coordinated integration of all electrical equipment in LV MCC and switchgear, including implementing arc flash features for safety per IEEE 1584 and NFPA70E
Scope, description, and value: MNS-MCC | ABB
Added Value: Launched Multi-million product line into the North American market. One product line covered three US standards for the North American market: UL845, UL891, and UL67
LV Motor Control centers automation product development, Seneca, SC, dates of involvement (1996-2005) *
Client: Schneider Electric
Role on project: New Product Development
Responsibilities: Coordinated integration of all electrical equipment in LV MCC and switchgear, including automation equipment and VFD’s
Scope, description, and value: Transparent Ready™ - Schneider Electric Digest Plus (schneider-electric.com)
Added Value: Launched Multi-million product line including multiple divisions for integration of equipment into customer sites.
Published Papers
- June 28, 2023: UL9540 rev 3 UL 9540 Energy Storage System (ESS) Requirements - Evolving to Meet Industry and Regulatory Needs: https://www.ul.com/news/ul-9540-energy-storage-system-ess-requirements-evolving-meet-industry-and-regulatory-needs
- Sept 15, 2012: Intelligent Automation and Controls of Power Industry Microgrids solutions: https://www.ourenergypolicy.org/wp-content/uploads/2013/08/M-12-SG-WPR-X-002-02-WAC-Automation-and-Controls-rkc.pdf
- August 21, 2012: Turning your datacenter into a microgrid; https://www.datacenterdynamics.com/en/news/turning-your-data-center-into-a-microgrid/
- May 15, 2012: A users guide to arc resistant low voltage switchgear and motor control: https://toc.proceedings.com/15083webtoc.pdf
- May 15, 2012: Financial Benefits of Using Power System Analytics for Mission-Critical Applications ROI: https://www.poweranalytics.com/company/pdf/2012%20M-12-SG-WPR-X-003-06%20ROI%20of%20Model-Validated%20Analytics.pdf
- April 20, 2012: Microgrid Webinar series – Power Analytics
- May 14, 2010: Reduction of arc flash hazards in low voltage equipment
- Sept 18, 2007: Reduction of arc flash hazards in low voltage motor control assemblies
Other Information
Naval Nuclear Operations; USS Arkansas, CGN-41 (1983-1989)