NEWS: MISO selects AEP-Berkshire JV to build $1.2B, 765-kV transmission project

MISO has tapped a joint venture between American Electric Power and Berkshire Hathaway Energy subsidiaries to build a $1.2B, 765-kV transmission project in Wisconsin. (Utility Dive)

  • Quick details: The project is expected to run some 190 miles and must be operational by June 1, 2034, per MISO.

2