In the latest episode of the American Public Power Association's Public Power Now podcast, John Bear, President and CEO of the Midcontinent ISO, discusses how MISO is planning for large load growth, details how the grid operator is preparing to meet summer power demand this year and provides an overview of MISO’s long range transmission planning efforts.
https://www.buzzsprout.com/1452280/episodes/19109101