Congratulations WSP and Jacobson winning this huge opportunity on a massive $37B transmission program from American Electric Power. Scope varies
by company and states but will likely include project management and controls, engineering and design, siting, public outreach, right-of-way acquisition and environmental services.
Fees for these services may amount to 6-10% of the AEP capex or $2-4B for these consultant teams.
Competition in the AEC industry just took a quantum leap. Exciting times.
https://www.enr.com/articles/64102-aep-taps-jacobs-wsp-for-37b-power-transmission-buildout