Georgia Power is locking in more solar through its CARES program, approving 5 PPAs with a combined capacity of just over 1 GW. (PV Tech)
The PPAs support the utility IRP target of 4 GW new renewables by 2035, alongside nuclear expansion and gas upgrades to meet 8.5 GW of projected load growth.