This Monday release is a special bonus episode where I am sitting down with Tony Clark, the President & Founder of Great Oaks.
This was a long overdue episode where we go into all things engineering, procurement, and contract or EPC work and we take some time to go over some of the basics of what goes into building a bitcoin mining facility.
Ever wonder what the average time to build a large scale mining facility is or what the average costs could be per megawatt? Stay tuned because we cover all of that today.
We actually had so much that we wanted to cover that we are going to be releasing “round 2” next Monday so keep an eye out for that as well!
You can find more about Great Oaks at: https://www.greatoaksco.com/
You can find more about Great Oaks on LinkedIn: https://www.linkedin.com/company/great-oaks-engineered-solutions/