Wind Farm in Mexico Completes First Successful IEC 61850 Application With Multivendor Interoperability

Published By Schweitzer Engineering Laboratories, Inc. (SEL)

To have a representative from Schweitzer Engineering Laboratories, Inc. (SEL) contact you, please fill out the form below and your information will be e-mailed to Schweitzer Engineering Laboratories, Inc. (SEL).

* Required Information

000-000-0000 ext:000 (Ext optional)

[Show Report Detail]

Contribute Your Work

It's easy to contribute articles, article proposals, commentary and analysis and be published online through Energy Central!

Sound interesting? Contact the editor for more information.

Wind Farm in Mexico Completes First Successful IEC 61850 Application With Multivendor Interoperability

Published By Schweitzer Engineering Laboratories, Inc. (SEL)

  • Published November 2008
  • 6 Page(s)

Considering the international scope of this project, CFE decided to build La Venta II’s transmission, protection, and control system using the IEC 61850 substation automation standard, which provides methods of developing best engineering practices for substation protection, integration, control, monitoring, metering, and testing. This approach enables CFE to evaluate the technologies selected for possible inclusion into future design standards.

 

 

 

 



Free To Download Now

Case Study: La Venta II Wind Farm
 
Our customer service can help if you are experiencing problems with this page.

Please contact our customer service department.

Our customer service hours are Monday-Friday from 8-5 MST



Sponsored Content