Charah Solutions

Charah Solutions is a leading provider of environmental and maintenance services to the power industry, with operations in coal-fired and nuclear power generation. We solve complex environmental challenges and are an industry leader in quality and safety.

Case Study

Excavation, Closure By Removal, and Reconstruction of Ash Ponds

Charah - Mount-Storm.png

Connect with Charah Solutions

Fill out this form to receive more information from Charah Solutions.

In 2016, to meet changing regulatory requirements, a Mid-Atlantic utility was required to excavate, close by removal, and reconstruct ash ponds but needed an innovative solution to complete the first closure by removal of ash ponds in that utility.

INNOVATIVE SOLUTIONS
In order to execute this Closure by Removal (CBR) impoundment project, Charah Solutions provided a turnkey solution, meeting engineering and regulatory challenges, including all construction and QA/QC engineering.

The project had three primary components – the excavation of five unlined coal combustion residuals (CCR) ponds, construction of three new larger lined ponds within the same footprint, and construction of a state-of-the-art effluent filtration system. Construction of the new CCR ponds featured a 2’ gradient control system (underdrain system), general fill layer, 8” Soil Graded Layer, Geocomposite Clay Liner, 60-mil HDPE liner, 32 ounce geotextile, and 10” concrete paved surface. The filtration system included design, procurement, and installation of multi-disc filters, chemical feed, pumps and piping as needed to convey wastewater from the CCR basins and plant effluent through the system. The filtration system was housed in a building to protect the system from weather and enhance operation and maintenance.

CCR Removal from these ponds was accomplished by utilizing both mechanical and hydraulic dredging methods. These methods proved effective and allowed Charah Solutions to maintain both schedule and budget while also providing recovery from multiple delays associated with weather and unforeseen changes in scope.

RESULTS
The construction of the new ponds and filtration system allows the power plant to continue compliant operations for the foreseeable future. Upon completion, over 130,000 cubic yards of CCRs were successfully excavated. Furthermore, in 2017, the utility partner recognized the team for working over 150,000 manhours without a recordable or lost time incident.

Case Study

Rob Reynolds's picture

Thank Rob for the Post!

Energy Central contributors share their experience and insights for the benefit of other Members (like you). Please show them your appreciation by leaving a comment, 'liking' this post, or following this Member.

Discussions

No discussions yet. Start a discussion below.

Get Published - Build a Following

The Energy Central Power Industry Network is based on one core idea - power industry professionals helping each other and advancing the industry by sharing and learning from each other.

If you have an experience or insight to share or have learned something from a conference or seminar, your peers and colleagues on Energy Central want to hear about it. It's also easy to share a link to an article you've liked or an industry resource that you think would be helpful.

                 Learn more about posting on Energy Central »