Energy Central News

Curated power industry news from thousands of top sources.

News

Wind Farm Fan Settlement Observation Service

Source: 
Tenders Monitor Africa-Asia

Company : YUDEAN GROUP GUIZHOU CO., LTD.

Address : 22nd Floor, Block B2, Longlong Business Building, Chengxin South Road, Guanshanhu District, Guiyang City, Guizhou Province Contact: Li Bin Contact number: 0851-88638723 Mobile phone: 18858185025 Agency Name: Guoyi Tendering Co., Ltd. Address: 16th Floor, No. 726, Dongfeng East Road, Guangzhou (Postcode: 510080) Tel: (020) 37680635/37860662 Fax: (020) 8767 3286 Contact: Cao Xiaoyu (15992497899), Sheng Zuqiang (13902282458)

Email : caoxiaoyu@ebidding.com, szq@ ebidding.com

Country : China

Location : China

Tender_No : 0724-1900C12N2354

Dead line : 2019-06-26

Local International : International

Funding Agency : No

Description : Tenders are invited for Wind Farm Fan Settlement Observation Service Project of Guangdong Power Group Guizhou Co., Ltd. 1. Project Name: Yudian Group Guizhou Co., Ltd. Wind Farm Fan Settlement Observation Service Project (hereinafter referred to as “Project”) 2. Tender No.: 0724-1900C12N2354 3. Project unit: Yudean Group Guizhou Co., Ltd. 4. Tendering agency: Guoyi Tendering Co., Ltd. 5. Project Overview: The bidding scope is the Yudian Group Guizhou Co., Ltd. wind farm, which includes Changshanyu Wind Farm, Xianrenshan Wind Farm and Dadingshan Wind Farm. 5.1 Changshanyu Wind Farm is located in the Buyi, Bai, Miao and Baoji Miao and Yi nationality towns in the northeastern part of Panxian County, Guizhou Province. The road mileage with Panxian County is about 71.2km, and the geographical coordinates are between 104°50′ east longitude. ~104°53′, between 25°53′~27°57′ north latitude, the ground elevation of the site is 1700m~2310m, and the total installed capacity of Changshanyu wind farm is 16.4MW. A total of 8 wind turbines have been in 2015. Power generation was completed on the 24th. 5.2 Xianrenshan Wind Farm is located in Shanpeng Town, Zunyi County, Zunyi City, Guizhou Province. The northernmost part is at the junction with Guancang Town, Tongzi County. The site area is generally rectangular from north to south. It is about 6km long from north to south and about 4km wide from east to west. The elevation of most areas is between 1500 and 1850m. The distance between the center of the wind farm and the straight line of Zunyi County is about 48km, the distance from Tonglu County is about 21km, the distance from Zunyi City is about 31km, the distance from Guiyang is about 150km, and the geographical coordinates are between 103°36′~109°35. ′, between 24°37′~29°13′ north latitude, there are Lanhai Expressway G75 and National Highway G210 in the east of Zunyi City, and there is Shanpan Town, Shanpan Town, where the county road directly passes through the county. There are a number of mudstone roads leading to the site, and the traffic conditions are relatively convenient. The installed capacity of Xianrenshan Wind Farm is 49.3MW, and 21 wind turbines with a single unit capacity of 1.8MW and 5 units with a capacity of 2.3MW are installed. The wind turbines were all built on January 29, 2016. 5.3 Dadingshan Wind Farm is located in Shiqi County and Jiangkou County, Tongren City, Guizhou Province. The mileage of the highway in Shiji County is about 52km, and the mileage of the highway in Jiangkou County is about 70km. This area is a low-middle mountainous area. The highest point of the field is Dading Mountain, with an elevation of about 1561.10m. The site is curved from the northeastern part of the country through the central male goose to the southwestern part of the fire to the northwest. The elevation of the site is 1200.00m~1560.00m. The slope along the ridge is relatively slow, generally 25°~35°. The slope on both sides of the ridge is relatively steep, generally 35°~45°, and the geographical coordinates are between 108°31′~108°35′ east longitude and 27° north latitude. Between 31′ and 27°35′, the approach road is from the exit of Longtangyu, Shijie County, Anjiang Expressway, and then the Shiji County along the S305 Provincial Highway to the Stony Dam, and then enters the area via the village road. The installed capacity of the wind farm is 48MW, and 24 sets of single-unit capacity 2MW wind turbines are installed. 24 sets of wind turbines were all built on November 4, 2016. For details, please refer to the technical specifications of the bidding documents. [Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.]

Document : http://www.bidsinfo.com/adminexe/documents/-CN3~20190607-14538882.html

Discussions

No discussions yet. Start a discussion below.

Get Published - Build a Following

The Energy Central Power Industry Network is based on one core idea - power industry professionals helping each other and advancing the industry by sharing and learning from each other.

If you have an experience or insight to share or have learned something from a conference or seminar, your peers and colleagues on Energy Central want to hear about it. It's also easy to share a link to an article you've liked or an industry resource that you think would be helpful.

                 Learn more about posting on Energy Central »