Energy Central News

Curated power industry news from thousands of top sources.

News

Supply of Power Transformer

Source: 
Tenders Monitor Africa-Asia

Company : GUJRANWALA ELECTRIC POWER COMPANY LIMITED

Address : Dy: Manager Ware House GEPCO Wazirabad Attn: Chief Engineer (Development) PMU Tel: +92-559200598, 9200593

Country : Pakistan

Location : Pakistan

Tender_No : STG-21

Dead line : 2019-04-17

Local International : International

Funding Agency : No

Description : Tenders are invited for Supply of Power Transformer A 132/11.5kV, 31.5/40 MVA 3-Phase Power Transformers alongwith with spares A-1 132/11.5kV, 31.5/40 MVA, 3-Phase Power Transformer complete with control cubicle, all allied accessories, extended creepage bushings alongwith HV/LV Terminal connectors, auxiliary panel and all others allied specified accessories, with MR Germany make OLTC etc. as per WAPDA / NTDC specification P-46:2008 (amended to date and approved drawings 07 A-2 Spare Parts for Transformers i) Copper Strips Bus Bars of size (15mmx150mmx4000mm OR 19mmx120mmx4000) 21 ii) Post Insulator with clamping arrangement to support Bus Bars on the Transformer Tank 21 iii) Post Insulator with clamping arrangement o hold Bus Bars on the other end 21 iv) HV bushing complete with gaskit and terminal Connectors 1 v) LV bushing complete with gaskit and terminal Connectors 2 vi) Fan with motor 6 viii) Winding temperature indicator 1 ix) Silica gel 50Kg x) Air Breather (each type) 3 Tenders documents can be obtained from the office of undersigned after payment of Rs.5000/- tender (non refundable) upto a day before tender opening date. The bid shall remain valid for acceptance for 150 days from the tender opening date and must accompany Bid Guarantee/CDR not less than 2% of the total cost of quoted quantity from registered firms , valid for 180 days issued by any Scheduled Bank of Pakistan on specified Proforma alongwith Sales Tax Registration Certificate Conditional tender or tender without Bid Guarantee will not be accepted. Closing Date: 17-Apr-2019 10:30:00 AM

Document : http://www.bidsinfo.com/adminexe/documents/-PK3~20190316-13449372.html

Discussions

No discussions yet. Start a discussion below.

Get Published - Build a Following

The Energy Central Power Industry Network is based on one core idea - power industry professionals helping each other and advancing the industry by sharing and learning from each other.

If you have an experience or insight to share or have learned something from a conference or seminar, your peers and colleagues on Energy Central want to hear about it. It's also easy to share a link to an article you've liked or an industry resource that you think would be helpful.

                 Learn more about posting on Energy Central »