Energy Central News

Curated power industry news from thousands of top sources.

News Article

Science and Technology Industrial Park Second Resettlement Community Phase 12-03, Phase II

Source: 
Tenders Monitor Africa-Asia

Company : STATE GRID JIANGSU ELECTRIC POWER COMPANY SUZHOU POWER SUPPLY COMPANY

Address : No. 555, Labor Road, Gusu District, Suzhou, Jiangsu Attn: Tian Guoliang Tel: +86-51264521409

Country : China

Location : China

Tender_No : E3205010304004464002002

Dead line : 2018-10-26

Local International : International

Funding Agency : No

Description : Tenders are invited for Suzhou Kefu Taihu Science and Technology Industrial Park Second Resettlement Community Phase 12-03, Phase Ii, Minjiang City Garden Phase Ii, Sudi 2016-Wg-28 Land, Taicang Haiyi Haoting Community Project Matching Project. Bidder qualification requirements 3.1 This bidding requires bidders to have [Power Engineering Level 3] or above and [Containment Type (Repair, Test) Power Facilities License Level 5] (inclusive) or [Send Power Transmission Project Level 3] (including) and above [the contracted (repair, test) power facilities license level 5] (including)qualifications, performance, and in the personnel, equipment, funds, etc. have the corresponding construction capabilities, of which, bidders The proposed project manager shall have the qualifications for the [Mechatronics Engineering Level 2] (including) and the valid safety production assessment certificate, and shall not be the project manager of other construction projects. 3.2 This tender does not accept consortium bidding. 3.3 Each bidder may submit bids for the bidding sections in the above-mentioned bidding section of this bidding project, but the bidding section is allowed at most. 4. Acquisition of bidding documents Those who wish to participate in the bidding, please October 16, 2018 to October 25, 2018 only, you can download the tender documents in Suzhou City public resources trading platform. 5. Submission, withdrawal and modification of tender documents (when reviewed in the Public Resource Trading Center) 5.1 The deadline for submitting bid documents (application deadline, the same below) can submit bid documents on the Suzhou Public Resource Trading Platform before 09:30 on October 26, 2018 ; 5.2 If the bid document is successfully uploaded after the deadline for submission, the recruiter will not accept it; 5.3 If the bidder withdraws the bidding documents before the deadline for submission of the bid documents specified in the bidding documents, the bidding documents shall be submitted to the tenderee through the trading platform. 5.4 If the bidder modifies or supplements the bid documents that have been successfully submitted before the deadline for submission of the bid documents specified in the bidding documents, the bidder shall use the “bidding document creation software” to make a complete bidding document and upload the trading platform. The bid documents shall be subject to the successful submission of the bid documents before the deadline for submission of the bid documents as specified in the bidding documents. 6. Other clear matters (1) Eligibility requirements for bid applicants: (1) Ability to independently conclude contracts; (2) Qualification categories and grades of bid applicants: [Power Engineering Level 3] (inclusive) (and [Container-type ( Repair, test) power facility permit level 5] (above) or above [send power transmission project level 3] (inclusive) or above (and [supporting equipment (repair, test) power facility permit level 5] ( Included) Qualifications (Note: The contractor, repair, and test must reach level 5 and above); (3) The company has safe production conditions and obtains a safe production license; (4) It is proposed to select a registered construction engineer ( Project Manager) Qualification Category Level: [Electromechanical Engineering Level 2] (inclusive); (5) Registered Builder (Project Manager) to obtain Safety Class B Certificate; (6) The project leader must meet one of the following conditions: 1. Project There is no construction in progress after the person in charge is changed. If the contractual construction contract of the building construction project is only for civil engineering, hydropower construction rather than general construction contracting (construction, installation and construction of various professional projects), the project leader shall obtain the main structure acceptance report and the original contractor agrees to participate in other projects. Proof of bidding can be regarded as no construction in progress. 2. The person in charge of the project has no construction in progress after the change, and the original contract period has expired and the date of the change has been completed for 6 months; or, due to non-contractor reasons, the project has been suspended for more than 120 days and has been constructed. The unit agrees and has already gone through the procedures for changing the project leader. 3. The person in charge of the project has a project under construction, but the project under construction and the project to be tendered belong to the same project, the approval of the same project, and the subcontracted construction or phased construction at the same construction site. (7) This tender does not accept joint bidding. If the consortium bids, the following requirements shall be met: a joint bidding agreement shall be attached; (8) The enterprises outside the province shall go through the qualification verification and registration procedures and obtain the qualification verification certificate (see Su Jianjian [2013] No. 572 and Sushang Jianjian [ 2013] No. 50); the domestic and foreign enterprises entering the Soviet Union are implemented according to the “Administrative Measures for the Construction of Enterprises in Suzhou City and the Soviet Union” (Su Jian Construction Regulation [2011] No. 1) (no need to provide this item for bidding using the pre-selected contractor list) ). [Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.]

Document : http://www.bidsinfo.com/adminexe/documents/-12733~20181011-11410551.htm

Content Discussion

No discussions yet. Start a discussion below.