FERC and NERC Issue Report on January 2018 Extreme Cold Weather Event

Dreamstime.com

FERC and NERC today released a joint staff report that once again stresses the need for generation owners and operators to adequately prepare for winter weather conditions to ensure bulk electric system reliability.  On January 17, 2018, regional operators in MISO and SPP called for voluntary reductions in electricity use due to abnormally cold temperatures and higher than forecast demand. The system remained stable. However, continued reliable operation would have required shedding firm load if MISO had experienced its largest single generation contingency in MISO South.  Today’s report finds that, despite prior guidance from FERC and NERC, cold-weather events continue to result in unplanned outages that imperil reliable system operations. It endorses the development of one or more mandatory Reliability Standards requiring generator owner/operators to prepare for the cold weather and provide information about those preparations to their Reliability Coordinators and Balancing Authorities.  Along with a Reliability Standard, enhanced outreach and actions by system operators to encourage generator performance can also help to prevent a recurrence of the large-scale unplanned outages like those seen during this event, the 2014 Polar Vortex and the 2011 Southwest cold weather event.  In addition to citing the failure to properly winterize generation facilities, the report says gas supply issues contributed to the event. 

The report makes a number of recommendations and identifies sound practices. Some recommendations echo the 2011 Southwest event report, including:

  • Generator owners and operators should perform winterization activities to prepare for cold weather, and should ensure the accuracy of their units’ ambient temperature design specifications;
  • Balancing Authorities and Reliability Coordinators should be aware of generating units’ specific limitations, such as ambient temperatures beyond which they cannot be expected to perform or the lack of firm gas transportation;
  • Planning coordinators and transmission planners should jointly develop and study scenarios to be better prepared for seasonal extreme weather conditions; and
  • Transmission owners and operators should conduct analyses that delineate different summer and winter ratings for both normal and extreme conditions.

 

The full report can be found at https://www.ferc.gov/legal/staff-reports/2019/07-18-19-ferc-nerc-report.pdf

Paul Dumais's picture

Thank Paul for the Post!

Energy Central contributors share their experience and insights for the benefit of other Members (like you). Please show them your appreciation by leaving a comment, 'liking' this post, or following this Member.

Discussions

No discussions yet. Start a discussion below.

Get Published - Build a Following

The Energy Central Power Industry Network is based on one core idea - power industry professionals helping each other and advancing the industry by sharing and learning from each other.

If you have an experience or insight to share or have learned something from a conference or seminar, your peers and colleagues on Energy Central want to hear about it. It's also easy to share a link to an article you've liked or an industry resource that you think would be helpful.

                 Learn more about posting on Energy Central »