Substation Design and Installation for Canada’s Largest Wind Farm

Published By S&C Electric Company

To have a representative from S&C Electric Company contact you, please fill out the form below and your information will be e-mailed to S&C Electric Company.

* Required Information

000-000-0000 ext:000 (Ext optional)

[Show Report Detail]

Contribute Your Work

It's easy to contribute articles, article proposals, commentary and analysis and be published online through Energy Central!

Sound interesting? Contact the editor for more information.

Substation Design and Installation for Canada’s Largest Wind Farm

Published By S&C Electric Company

  • Published December 2008
  • 2 Page(s)

The Prince Wind Farm is the largest wind generation facility in Canada. The wind farm has two collector substations that consolidate power from the 1500-kW wind turbine generators. Prince 1 Collector Substation receives power from four feeders, through the underground collector system connected to 66 of the generators. Prince 2 Collector Substation receives power from three feeders, through the predominantly overhead collector system connected to the remaining 60 generators.

 

 

 

 



Free To Download Now

Substation Design and Installation
 
Our customer service can help if you are experiencing problems with this page.

Please contact our customer service department.

Our customer service hours are Monday-Friday from 8-5 MST



Sponsored Content